Factors Affecting The Speed of Certificate Acceptance of Functionality
Abstract
Topic of this research was carried out in relation to the Regulation of the Minister of Public Works 25/PRT/M/2007 concerning the Certificate of Feasibility of Function (SLF). The factors affecting the speed of getting the certificate will be investigated. Each region is required to make further regional regulations that refer to the Regulation of the Minister of Public Works 25/PRT/M/2007. Such a regional regulation can affect the speed and quality of results. The case studies selected in this study were SLF at the Microbiology Building, FKKMK UGM and Hotel de Braga, Bandung. This research based on the results of interviews and data obtained in the microbology building UGM Yogyakarta and Hotel de Braga Bandung. The factors that influence the SLF application process are socialization related to SLF, human resources in the application and issuance process, and understanding of the main tasks and functions of each related human resource. The difference requirements and procedures of the regional regulations does not affect each process but does affect the duration of the SLF issuance process. Substantially, the regional regulations in Sleman Regency has no differences compared to the regional regulations in the city of Bandung regarding SLF but sequence.
Keywords
Full Text:
PDFReferences
Abbott, L. F., DePasquale, B., and Memmesheimer, R. M. (2016). Building functional networks of spiking model neurons. Nature neuroscience, 19(3), 350-355.
Arıkan, M., Deshpande, V., and Sohoni, M. (2013). Building reliable air travel infrastructure using empirical data and stochastic models of airline networks. Operations Research, 61(1), 45-64.
Banihashemi, S., Hosseini, M. R., Golizadeh, H., and Sankaran, S. (2017). Critical success factors (csfs) for integration of sustainability into construction project management practices in developing countries. International Journal of Project Management, 35(6).
Davenport, T. (2018). Island-building in the south china sea: legality and limits. Asian Journal of International Law, 8(1), 76-90.
Fuadi, F., Natsir, M., and Suriyani, M. (2021). Problematics legality building of mosque without establishing building permit in Aceh. Syiah Kuala Law Journal, 5(1), 65-77.
Gruber, U., and Margreth, S. (2001). Winter 1999: a valuable test of the avalanche-hazard mapping procedure in Switzerland. Annals of Glaciology, 32, 328-332.
Ipek, E., Condit, J., Nightingale, E. B., Burger, D., and Moscibroda, T (2010). Dynamically replicated memory: building reliable systems from nanoscale resistive memories. ACM Sigplan Notices, 45(3), 3-14.
Kuzina, E., Rimshin, V., & Kurbatov, V. (2018, December). The reliability of building structures against power and environmental degradation effects. In IOP Conference Series: Materials Science and Engineering, 1-6.
Lawlor, B., and Walsh, P. (2015). Engineering bioinformatics: building reliability, performance and productivity into bioinformatics software. Bioengineered, 6(4), 193-203.
Lu, L., and Ip, K. Y. (2009). Investigation on the feasibility and enhancement methods of wind power utilization in high-rise buildings of Hong Kong. Renewable and Sustainable Energy Reviews, 13(2), 450-461.
Trumansyahjaya, Kalih. (2013). Penilaian terhadap keandalan bangunan gedung pada bangunan gedung di universitas negeri gorontalo. Jurnal Ilmiah Media Engineering, 3(1). 1-20.
Parmelee, J. H. (2014). The agenda-building function of political tweets. New media & society, 16(3), 434-450.
Penner, D. E., Giles, N. D., Lehrer, R., and Schauble, L. (1997). Building functional models: designing an elbow. Journal of Research in Science Teaching: The Official Journal of the National Association for Research in Science Teaching, 34(2), 125-143.
Shahnazaryan, D., O’Reilly, G. J., and Monteiro, R. (2021). Story loss functions for seismic design and assessment: Development of tools and application. Earthquake Spectra, 37(4).
Wong, I. L., Perera, S., and Eames, P. C. (2010). Goal directed life cycle costing as a method to evaluate the economic feasibility of office buildings with conventional and TI‐façades. Construction management and economics, 28(7), 715-735.
DOI: https://doi.org/10.17509/jodie.v2i1.46910
Refbacks
- There are currently no refbacks.
Copyright (c) 2022 Andhyni Kusumahastiti

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.







