ANALISIS WAKTU, TENAGA KERJA DAN PRODUKTIVITAS PEKERJAAN PONDASI FOOTPLAT PROYEK PEMBANGUNAN GEDUNG X
Abstract
Construction projects are a key driver in infrastructure development and require careful planning to ensure time and resources are used effectively. This study explores how the planned schedule, theoretical calculations, and actual completion time compare in the footplate foundation work for Building X in Banten. In addition to looking at time, the research also considers whether the number of workers was adequate and how efficiently they performed. The approach combines field observations, literature review, time analysis using the Critical Path Method (CPM), labor analysis based on Unit Price Analysis (AHS) coefficients, and productivity evaluation. The results show that the work was finished in just 16 days—faster than both the original 21-day plan and the 22-day CPM estimate. This quicker completion was largely due to the use of overtime and a 6.2% increase in the workforce. Although individual productivity was slightly lower than expected, the project still managed to save time by effectively adjusting the number of workers and extending work hours. Overall, the findings suggest that increasing the workforce and allowing overtime can be effective ways to speed up construction projects, even if they don’t necessarily improve individual productivity.
Keywords: Construction, Footplate, Labor, Productivity, Time Management
Keywords
Full Text:
PDFReferences
Angelica, N. P., & Puspasari, V. H. (2024). Kajian Faktor-Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja Proyek Konstruksi. Basement: Jurnal Teknik Sipil, 2(1), 37-44.
Bertan, C. V., Dundu, A. K. T., & Mandagi, R. J. (2016). Pengaruh pendayagunaan sumber daya manusia (Tenaga Kerja) terhadap hasil pekerjaan (studi kasus Perumahan Taman Mapanget Raya (TAMARA)). Jurnal Sipil Statik, 4(1), 139886.
Evanda, P. N. L., & HS, M. S. (2021). Validasi Perangkat Pembelajaran dan Media Miniatur Pondasi Foot Plate Pada Mata Pelajaran Estimasi Biaya Konstruksi di SMKN 1 Mojokerto. Jurnal Kajian Pendidikan Teknik Bangunan, 7(2).
Fikri, H. (2023). Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Struktur Atas (Studi Kasus: Proyek Pembangunan Hotel Tentrem Alam Sutera) (Doctoral dissertation, Politeknik Negeri Jakarta).
Gunawan, A., & Setyawan, A. (2022). Analisis Produktivitas Hasil Pekerjaan Konstruksi Antara Kerja Normal dan Kerja Lembur. Surakarta Civil Engineering Review (SCER), 2(1), 49-61.
Hendriyani, I., Pratiwi, R., & Noor, A. (2024). Analisis Pemerataan Sumber Daya Tenaga Kerja Konstruksi Pada Proyek Pembangunan Gedung Hemodialisa Kabupaten Penajam Paser Utara: Analysis Of Equalization Of Construction Workforce Resources In The Hemodialysis Building Development Project In Penajam Paser Utara District. Jurnal Ilmiah Teknik Sipil TRANSUKMA, 6(1), 36-45.
Hudoyo, C. P., & Sismiani, A. (2022). Analisis Pengaruh Kerja Lembur Terhadap Produktivitas Pekerja Konstruksi Pada Proyek Pembangunan Gedung. Humantech: Jurnal Ilmiah Multidisiplin Indonesia, 1(9), 1306-1313.
Jayantari, M. W., Predana, I. M. A., & Wade, Y. R. (2022). Analisis Biaya Serta Percepatan Durasi Proyek Menggunakan Metode Crashing dengan Sistem Waktu Gilir Kerja dan Lembur (Studi Kasus: Puskesmas Wolowaru, Kabupaten Ende). Reinforcement Review in Civil Engineering Studies and Management, 1(1), 20-26.
Kartika, N., Robial, S. M., & Pratama, A. (2021). Analisis produktivitas tenaga kerja pada pekerjaan kolom di proyek pembangunan gedung Pemda Kabupaten Sukabumi. Jurnal Momen Teknik Sipil Suryakancana, 3(2), 103-112.
Kombong, E. P. (2025). Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Pile Cap Menggunakan Macro VBA. Jurnal Komposit, 9(1), 115-125.
Messah, Y. A., Berelaku, D. C., & Ramang, R. (2023). Perbandingan penambahan waktu kerja dan penambahan tenaga kerja terhadap biaya pelaksanaan proyek. Jurnal Teknik Sipil, 12(2), 215-228.
Norjana, N., & Zulfiati, R. (2020). Analisa produktivitas tenaga kerja terhadap pekerjaan kolom dan balok beton bertulang. Jurnal Talenta Sipil, 3(2), 82-86.
Nurhadi, A. (2015). Perbandingan Produktivitas Tenaga Kerja Konstruksi pada Jam Kerja Reguler dan Jam Kerja Lembur pada Pembangunan Gedung Bertingkat di Surabaya. Rekayasa Teknik Sipil, 1(1), 27-32.
Pawiro, S., Tjakra, J., & Arsjad, T. T. (2015). Optimalisasi Produktivitas Tenaga Kerja dalam Proyek Konstruksi (Studi Kasus: Pembangunan Gedung Mantos Tahap III). Tekno, 13(62).
Permatasari, T. R., Setyaning, L. B. T., & Aziz, U. A. (2023). Analisis Penjadwalan Menggunakan Metode Critical Path Method (CPM) pada Pembangunan Gedung Dindikbud Kabupaten Purworejo. Surya Beton: Jurnal Ilmu Teknik Sipil, 7(2), 169-175.
Prasetyo, D. A., Anthony, A., Chandra, H. P., & Ratnawidjaja, S. (2017). Analisis Produktivitas Tenaga Kerja dengan Metode Work Sampling: Studi Kasus Proyek Tunjungan Plaza 6. Jurnal Dimensi Pratama Teknik Sipil, 6(1).
Sofia, D. A., & Putri, A. A. E. (2021, September). Analisis Perbandingan Penambahan Jam Kerja dan Tenaga Kerja terhadap Waktu dan Biaya Proyek dengan Metode Time Cost Trade Off. In Prosiding Industrial Research Workshop and National Seminar (Vol. 12, pp. 846-854).
Sumarningsih, T. (2014). Pengaruh Kerja Lembur pada Produktivitas Tenaga Kerja Konstruksi. Media Komunikasi Teknik Sipil, 20(1), 63-69.
Wiguna, I. M. A. S., Bintana, I. B. P., & Rani, N. M. S. (2021, December). Analisis Optimalisasi Waktu Pelaksanaan Proyek Pembangunan Smpn 14 Denpasar Menggunakan Metode PerT. In Proceedings (Vol. 9, No. 1, pp. 118-127).
Wijaya, G. A., Sucita, I. K., & Saputra, J. (2021). Analisis Tingkat dan Faktor Produktivitas Tenaga Kerja pada Pekerjaan Struktur Atas di Proyek X. Portal: Jurnal Teknik Sipil, 13(2), 56-63.
DOI: https://doi.org/10.17509/k.v23i2.85827
Refbacks
- There are currently no refbacks.
Copyright (c) 2025 Universitas Pendidikan Indonesia (UPI)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Teknik Sipil
KOKOH