Mengoptimalkan Proses Manajemen Risiko Industri Furnitur Dengan Implementasi ISO 31000 Pengelolaan Risiko Yang Sistematis
Abstract
Keywords
Full Text:
PDFReferences
Akkiyat, I., & Souissi, N. (2019). Modelling risk management process according to ISO standard. International Journal of Recent Technology and Engineering, 8(2), 5830–5835. https://doi.org/10.35940/ijrte.B3751.078219
Alijoyo, A., & Norimarna, S. (2021). The Role of Enterprise Risk Management (ERM) Using ISO 31000 for the Competitiveness of a Company That Adopts the Value Chain (VC) Model and Life Cycle Cost (LCC) Approach. Vc, 127–151. https://doi.org/10.33422/3rd.icbmf.2021.03.130
Andry, J. F., Hadiyanto, & Gunawan, V. (2023). Intelligent Decision Support System for Supply Chain Risk Management Process (SCRMP) with COBIT 5 in Furniture Industry. International Journal on Advanced Science, Engineering and Information Technology, 13(2), 736–743. https://doi.org/10.18517/ijaseit.13.2.17359
Astuti, R. S. D., Astuti, A. D., & Hadiyanto. (2018). Preliminary Design of Industrial Symbiosis of Smes Using Material Flow Cost Accounting (MFCA) Method. E3S Web of Conferences, 31, 1–7. https://doi.org/10.1051/e3sconf/20183104008
Azizi, M., & Faezipour, M. (2016). Furniture industry management by applying SCM. Cogent Business and Management, 3(1). https://doi.org/10.1080/23311975.2016.1155811
De Oliveira, U. R., Marins, F. A. S., Rocha, H. M., & Salomon, V. A. P. (2017). The ISO 31000 standard in supply chain risk management. Journal of Cleaner Production, 151, 616–633. https://doi.org/10.1016/j.jclepro.2017.03.054
Dehdar, E., Azizi, A., & Aghabeigi, S. (2018). Supply Chain Risk Mitigation Strategies in Automotive Industry: A Review. IEEE International Conference on Industrial Engineering and Engineering Management, 2019-Decem, 84–88. https://doi.org/10.1109/IEEM.2018.8607626
Faturahman, R. (2020). Analisis Pengaruh Supply Chain Management terhadap Kinerja Perusahaan (Studi Pada Industri Furniture di Sleman). 2507(February), 1–9.
Indrawati, S., Prabaswari, A. D., & Fitriyanto, M. A. (2018). Risk control analysis of a furniture production activities using hazard identification and risk assessment method. MATEC Web of Conferences, 154, 2–5. https://doi.org/10.1051/matecconf/201815401102
Iritani, D. R., Silva, D. A. L., Saavedra, Y. M. B., Grael, P. F. F., & Ometto, A. R. (2015). Sustainable strategies analysis through Life Cycle Assessment: A case study in a furniture industry. Journal of Cleaner Production, 96, 308–318. https://doi.org/10.1016/j.jclepro.2014.05.029
Kulinska, E., & Matulewski, M. (2022). Risk Management Instruments in the Supply Chain of the Furniture Industry. European Research Studies Journal, XXV(Issue 2B), 249–258. https://doi.org/10.35808/ersj/2958
Magang, L., Studi, P., Rekayasa, M., Internasional, U., & Indonesia, S. (2021). Manajemen Risiko Pada Proyek Pembangunan Industri Furniture ( Meuble ) Pt . Kasura Manajemen Risiko Pada Proyek Pembangunan Industri Furniture ( Meuble ) Pt . Kasura. 2011810015.
Nalhadi, A., Kurniasari, A., Djamal, N., Suryani, S., & Supriyadi, S. (2019). Supply chain risk assessment of cotton shirt production uses the house of risk method. Journal of Physics: Conference Series, 1381(1). https://doi.org/10.1088/1742-6596/1381/1/012060
Novia Sahraen, A., Juli Andri, A., & Sundari, S. (2020). Analisis Risiko Pada Supply Chain Management Menggunakan Framework Iso 31000:2009 (Studi Kasus: Pt. Xyz). Industrika: Jurnal Ilmiah Teknik Industri, 4(2). https://doi.org/10.37090/indstrk.v4i2.234
Pellegrino, R., Russo, F., & Basile, L. J. (2024). The role of supply chain integration in the risk management of circular economy: a multiple case study in the furniture industry. Procedia Computer Science, 232, 2933–2940. https://doi.org/10.1016/j.procs.2024.02.109
Pradita, S. P., Ongkunaruk, P., & Leingpibul, T. (2020). The Use of Supply Chain Risk Management Process (SCRMP) in Third-Party Logistics Industry: A Case Study in Indonesia. Industria: Jurnal Teknologi Dan Manajemen Agroindustri, 9(1), 1–10. https://doi.org/10.21776/ub.industria.2020.009.01.1
Ronny, A. (2018). Implementasi Manajemen Risiko Proyek Pada PT . XX Dengan Menggunakan Pendekatan House of Risk (HOR) Berdasarkan ISO 31000:2018. Program Studi Teknik Industri, Fakultas Teknik, Universitas Tanjungpura, Pontianak, 78124, 80–87.
Santovito, S., Ricciardi, F., Baldassarre, F., & Silvestri, R. (2022). Supply chain risk management for a sustainable strategy: a study in the furniture industry. International Journal of Decision Sciences, Risk and Management, 10(3/4), 227. https://doi.org/10.1504/ijdsrm.2022.10049888
Ulfah, M. (2021). Mitigasi risiko rantai pasok industri furniture dengan menggunakan metode house of risk di IKM Sinar Muda. Journal Industrial Servicess, 7(1), 93. https://doi.org/10.36055/jiss.v7i1.12745
Yu, Y., Wang, X., Zhong, R. Y., & Huang, G. Q. (2017). E-commerce logistics in supply chain management. Industrial Management & Data Systems, 117(10), 2263–2286. https://doi.org/10.1108/imds-09-2016-0398
DOI: https://doi.org/10.17509/manajerial.v23i2.76988
Refbacks
- There are currently no refbacks.
Copyright (c) 2024 Universitas Pendidikan Indonesia (UPI)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Manajerial is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
View My Stats


_001_-_Copy.jpg)


